Welcome To - Shenzhen Jin Jian Da Construction Co., Ltd!

891339018@qq.com

18719060906

You are here: Home > Range of application > Filling foam concrete steel structure

Range of application

Shenzhen Jin Jianda Construction Co., Ltd. Contact: Mr. Zeng Tel: 18719060906
E-mail: 891339018@qq.com
Address: Bao'an District of Shenzhen City manhole streets New Town Plaza, Building A, Room 1508

Construction site of foam concrete
Construction site of foam concrete

Foam concrete construction preparation When 1, to ensure that normal operation of the equipment, check the status of their loss of work, material must be in place. 2 places, buildings in need of pouring fresh concrete must be clean, no loose, without peeling. Check and clean up contamination on the surface of, and removing excess water, carefully check the readiness of the various steps, qualified. 3, to ensure that the transfer process the integrity of the machine must be sure there is enough water. Foam concrete construction procedure 1, start the machine, by construction personnel to operate the machine

Foam concrete construction preparation
When 1, to ensure that normal operation of the equipment, check the status of their loss of work, material must be in place.
2 places, buildings in need of pouring fresh concrete must be clean, no loose, without skin. check and clean up contamination on the surface of, and removing excess water, carefully check the readiness of the various steps, qualified.
3, to ensure that the transfer process the integrity of the machine must be sure there is enough water.
Foam concrete construction procedure
1, start the machine, by construction personnel to operate the machine and started machine debugging, which want to examine whether there are any loopholes, sure no problem and begin construction.
2, and adjustment bubble concrete of concentration, General density in 300-1800kg/M3 around, and in 300-1200kg/m3 of bubble concrete most common. need high concentration of bubble concrete Shi, can appropriate improve water mud concentration to control bubble size, instead, is can appropriate reduced water mud concentration. can first put foaming agent added to water in the, General water is 1.6 to 10kg Zhijian, sent bubble agent is 0.1 to 0.6kg Zhijian, then makes its mixed uniform, Takes approximately no more than 3 minutes. formation of crystals to be used next. Shenzhen foam concrete , foam concrete manufacturer in Shenzhen, lightweight foamed concrete manufacturers in Shenzhen Jin Jianda building co., Ltd.

KeyWord:

Address:Room 1508, Building A, New Town Plaza, Shajing Street, Bao'an District, Shenzhen  TelePhone:18719060906  MobilePhone:18719060906  E-mail:891339018@qq.com

Mobile